Listing description

TG Set is back pressure type turbine-generator set (inlet steam parameters: p= 59 bar, t = 475 ºC, m= 209 t/h; back pressure parameters: p = app4 bar, t = 175ºC, m= 0-209 t/h) connected to common steam outlet (parameters: p = app. 3.5 bar, t = 175 ºC-Level 3 steam parameters L3). One regulated extraction of the turbine is connected to steam outlet (parameters: p = app10 bar, t = 280 ºC, m = 0-60 t/h-Level 2 steam parameters L2) and goes to consumers. The year of manufacturing and start-up is 1976/77.

Main characteristics of the steam TG Set
STEAM TURBINE
Manufacturer
AEG-Kanis Turbinefabrik Gmbh, Germany
ID No. 18159
Year 1975
Type GE50
Back-pressure
Nor (r/min)
3000
Output power (MW) 25 MW
Inlet steam parameters
p= 59 bar
t= 475 oC
steam flow m= 209 t/h
Extraction parameters
App p=11 bar
Steam flow m= 0-60 t/h
Tepmerature t= 280ºC
Back pressure parameters
Back pressure app. p=5 bar
t=175ºC
m=0-209 t/h
No. Working hours (approx.)
150.000

GENERATOR
Manufacturer Rade Koncar, Croatia
ID No. 13583
Year 1975
Type S1726-2, Y
Nor (r/min) /Frequency 3000 / 50 Hz
Power/Voltage/Current 31500 kVA / 6300V / 2887A
cos f 0.8
Excitation 175V,443A
Cooling Air-water
No. Working hours (approx.) 150.000

Country of placement: Serbia

Present condition of TG Set
TG Set is not in the operational condition. The conservation was performed in 1998 after general overhaul
During general visual inspection of TG Set defects in steam or oil sealing systems (no steam or oil leakage traces noticed, except possible steam leakage on LP turbine part), mechanical damages, absence of some crucial parts and assemblies or defects on TG set fundament set haven’t been recorded.
The non-critical level of corrosion is noticed on turbine-generator assemblies, but it could be found as critical on oil system, cooling system, pumps. Certain number of valves, fittings and other pipeline system parts is missing. I&C is very old and in very bad condition and should be completely replaced.
The TG Set planned shut down was performed in 1992 after approximately 150.000 working hours.

Rehabilitation and /or reconstruction of TG Set is possible.

This equipment is located in RS


Please note that this description may have been translated automatically.

Availability: listing already sold

Listing information

Manufacturer Aeg kanis
Model GE50
Year 1975
Country Serbia Serbia
Condition Good
Main category Complete Plants
Subcategory Power Plant
ID P21026003

Availability: listing already sold

About the seller

Client type End User
On Kitmondo since 2012
Number of listings 0
Country Serbia Serbia
Last activity Oct. 26, 2012