Specifications

System -
Input -
-------------------
Worked hours 0 hours
Hours under power
State good
At local norms ---------
Status under power

Description

COMPLETE PAINTING TECHNOLOGY - Pretreatment line +cataphoretic electro-coating (KTL) painting line + powder coating line.

Lines are good condition and still in operation. Sale planned for 4th quarter of 2025
THE PRICE IS NEGOTIABLE

Year of construction – 2009
Condition – good (used- fully functional), preventive maintenance carried out several times a year
Max. part size: LWH 6 x 2,4 x 2,6 m
Max. part weight: 1500 kg

technology set-up:

1. Transferring system (loading-turning-carrying devices + conveyors)

2. Pretreatment line .( Degreasisng 1+2, Rinsing 1+2, Zinkophosphate, Rinsing 3+4)

3. KTL Cataphoresis painting, Rinsing UF1+UF2+UF3, 2 Curing ovens, Cooling zone.

4. Powder coating line (Automated painting booth, Manual painting booth, 2 Curing ovens, Cooling Zone

5. Additional equipment.(Full piping system with fitting, heating system, circulation system, oil separator, pneumatic doors, rectifier, control unit, powdering equipment, filter unis, gas burners, air handling system, air drier, neutralization device, cesspits

Please note that this description may have been translated automatically. Contact us for further information. The information of this classified ad are only indicative. We recommend to check the details with the seller before a purchase


knipl---p240823041_7.pdf Download
Client type User – large company
Active since 2024
Offers online 1
Last activity Dec. 16, 2024

Description

COMPLETE PAINTING TECHNOLOGY - Pretreatment line +cataphoretic electro-coating (KTL) painting line + powder coating line.

Lines are good condition and still in operation. Sale planned for 4th quarter of 2025
THE PRICE IS NEGOTIABLE

Year of construction – 2009
Condition – good (used- fully functional), preventive maintenance carried out several times a year
Max. part size: LWH 6 x 2,4 x 2,6 m
Max. part weight: 1500 kg

technology set-up:

1. Transferring system (loading-turning-carrying devices + conveyors)

2. Pretreatment line .( Degreasisng 1+2, Rinsing 1+2, Zinkophosphate, Rinsing 3+4)

3. KTL Cataphoresis painting, Rinsing UF1+UF2+UF3, 2 Curing ovens, Cooling zone.

4. Powder coating line (Automated painting booth, Manual painting booth, 2 Curing ovens, Cooling Zone

5. Additional equipment.(Full piping system with fitting, heating system, circulation system, oil separator, pneumatic doors, rectifier, control unit, powdering equipment, filter unis, gas burners, air handling system, air drier, neutralization device, cesspits

Please note that this description may have been translated automatically. Contact us for further information. The information of this classified ad are only indicative. We recommend to check the details with the seller before a purchase


Specifications

System -
Input -
-------------------
Worked hours 0 hours
Hours under power
State good
At local norms ---------
Status under power

About this seller

Client type User – large company
Active since 2024
Offers online 1
Last activity Dec. 16, 2024

Here is a selection of similar machines

KNIPLE-COMPLETE PAINTING TECHNOLOGY