-
Machinery
Choose from 20,028 used machinery listings
- Auctions
- Sell machines
- Sell complete plants
- What is Kitmondo?
- About us
- Blog
Last update on 2018
April 30TH
Entire 5 unit asking 1.3M USD per unit. Total of 5 unit price is 6.500.000 USD.
for 1-3 unit purchase asking 1.4M USD
per unit
Price slightly negotiable
This price includes freight charges to US/Middle east/asia/EU
Dismantling fees will be paid by the buyer.
Westinghouse (siemens) GT( GAS Turbine ) model W501D5 / 5 units left
Built in 1995 sept
fully serviced in perfect condition
Westinghouse Siemens Quality checked in 2016 sept certificate A+
Full service history
500MW (60HZ) GAS TURBINE POWER PLANT
GAS TURBINE GENERATOR SET: 100MW x 5 units
HZ: 60hz
Fuel : LNG
Build in:1995
stopped operation : June 2013
Gas Turbines
Manufacturer : WESTINGHOUSE(SIEMENS)
Model Name : W501D5
Type : Axial Flow
Power Output : 100, 000 kW(100MW)
Stages : 4 stage
Inlet Temp. : 1093 ?
Exhaust Temp. : 530 ?
Exhaust Flow : 1313272 kg/h
TAC Temp. : 15?
Speed Governor : DEHC
-Starter System
Type : Electric Motor
Capacity : 1530 kW
Quantity : 1 ea
-Combustor
Type : Can-Annular
Quantity : 14 ea
-Compressor
Type : Axial Flow
Air Mass Flow : 358 N?/min
Inlet Temp. : 15?
Pressure Ratio : 14:01
Outlet Pressure : 14.462 kg/?
Stages : 19 stage
Outlet Temp. : 389 ?
2.Generators
Manufacturer : WESTINGHOUSE(SIEMENS)
Type : OAC(Open-Air-Cooled)
Rated Power : 129(143) MW(MVA)
Power Factor/ short-circuit ratio : 90%/0.695
Frequency : 60Hz/2pole
Speed : 3600 RPM
Rated Voltage/Current : 13.8 kV/5731 A
Insulation Class : F
-Exciter
Speed : 3600 RPM
Exciter Type : PMG
Rated Voltage/Current 325 V/1006 A
Protection Devices : 87G, 59GN, 40, 32, 46, 51V, 60, 25
Neutral Grounding : NGR
Bus Bar : IPB(3phases)
Rotation Direction : CW(Viewed Form Exciter end)
3.Operation hours
Gas Turbine #1. 37, 566hours(1996.1~2013.6)
Gas Turbine #2. 37, 013hours(1996.1~2013.6)
Gas Turbine #3. 39, 800hours(1996.1~2013.6)
Gas Turbine #4. 41, 541hours(1996.7~2013.6)
Gas Turbine #5 41, 819hours(1996.7~2013.6)
Gas Turbine #6. 40, 524hours(1996.7~2013.6)
4.Operation hours from overhaul to stop
Gas turbine #1: 18, 117 hours
Gas turbine #2: 16, 611 hours
Gas turbine #3: 17, 098 hours
Gas turbine #4: 15, 686 hours
Gas turbine #5: 17, 978 hours
Gas turbine #6: 16, 921 hours
5.Generator serial number
Generator#1. 93P0621
Generator#2. 93P0623
Generator#3. 93P0635
Generator#4. 93P0684
Generator#5. 93P0695
Generator#6. 93P0694
6.Scope of supply
Turbine
Generator
Control panel(Electric package)
Switchgear box
Mechanical room equipment
Currently installed with target dismantling schedule during 2016
This equipment is located in KR
Manufacturer | Westinghouse |
Model | W501D5 500MW |
Year | 1995 |
Country | South Korea |
Condition | Good |
Main category | Complete Plants |
Subcategory | Gas Turbine |
ID | P61006002 |
Client type | Machinery dealer |
On Kitmondo since | 2016 |
Number of listings | 0 |
Country | South Korea |
Last activity | Aug. 29, 2019 |